Seismic – NPC / SPC

Sobin-Harte Architects provides expertise comprehensive architectural evaluations and seismic corrections.  We have provided extensive surveys for multiple facilities, assembled Seismic Assessment reports for OSHPD review and approvals.  These identify the extent of seismic improvements required for individual buildings for SB 1953 compliance.  Construction documents are developed with detailed phasing to implement seismic corrections in multi-story hospital buildings. Seismic Renovations are phased to maintain Healthcare Operations, to provide continuity of care, and to maintain Fire-Life-Safety measures at all times.  Seismic upgrade scope includes move management, planning, and implementation.  Seismic Corrections range from the structural reinforcement of beams, connections, and columns, as well as to upgrading anchorage of essential and non-essential.  Plans for VSI (Voluntary Seismic Improvements) at each facility were phased and staggered in accordance to SB 1953 OSHPD mandated calendar for compliance. This requires critical scheduling of plan development and construction duration to facilitate timely implementation of required seismic upgrades.  Seismic Assessment Reports included planning for decommissioning of acute care buildings that could not be made compliant, we provided planning services for conversion of these spaces to non-critical uses, outpatient care or other services.   

PAST PROJECTS

  • ALTA HOSPITALS HEALTH SYSTEM

    SOUTHERN CALIFORNIA HOSPIAL AT CULVER CITY

    - ED Replacement – 22 Bed

    - Voluntary Seismic Improvements (VSI) – Pavilion Building

    LOS ANGELES COMMUNITY HOSPITAL

    - NPC 3/4

    - Voluntary Seismic Improvements (VSI)

  • PROVIDENCE HEALTH SYSTEM

    SAINT JOSEPH MEDICAL CENTER

    - SB 1953: Evaluation & Compliance Plan

    - South & East Buildings SB 1953 Evaluation

    HOLY CROSS MEDICAL CENTER

    - SB 1953: Evaluation & Compliance Plan

  • PRIME HEALTHCARE SYSTEMS

    SHERMAN OAKS HOSPITAL:

    - SB 1953 Evaluation Report & Compliance Plans

    - SB 1953: CAN Seismic upgrades

    - SB 1953: HAZUS Study

    - Sherman Oaks Hospital 1956 & 1966 Buildings Seismic Retrofits

  • TRI CITY REGIONAL MEDICAL CENTER

    TRI CITY REGIONAL MEDICAL CENTER

    - HAZUS

    - HVAC Anchorage

    - NPC-2 compliance

    - NPC-3 Upgrade

    - SB 1953 Evaluation Report

  • CITY OF HOPE NATIONAL MEDICAL CENTER

    CITY OF HOPE

    SB 1953 Decommission Assessment

    Seismic Evaluation and Feasibility

  • SIMI VALLEY HOSPITAL

    SIMI VALLEY HOSPITAL

    - 1962 & 1971 Patient Buildings SB 1953 Evaluation Report